China
>>Home>>Open Courses>>Personal Management
Course Search
Download Center
Fast die change SMED
One of the major challenges facing the manufacturing industry in twenty-first Century is how the company's manufacturing systems can produce small, multi variety products in a very short period of time in a rapidly changing global competition. Consumption in the same or less resources, lean manufacturing more and more application of quick change mold technology (also called a minute change mould method) to deal with this challenge. This course by the combination of teaching and practice, through simulated combat exercise help in-depth understanding of your quick die change and a minute for the principle and method of model and how smoothly in the factory processes in the application of these techniques. The implementation of quick die technology is for the successful implementation of Kanban system and balanced scheduling and lay a solid foundation.
Course Information
  • Time:2023-05-13-13
  • Location:Shanghai Jingan District Jincheng West Tianmu Road No. 511 building room 805
  • Course Series:Lean Production
  • Price:1800¥/people
  • Course Object:Production, process, equipment department manager, supervisor and engineer.
  • Lecturer:Full time Lecturer
  • Internal Training: YES
  • Support Hotline:021-52797163
Stage theme course content
A mass production model of the advantages and disadvantages of mass production advantage is past
Analyze market trends
The current mass production problems
A re understanding of the manufacturing process waste
Analysis of manufacturing process of hidden costs
The calculation of economic production quantity

The summary: must change the mass production of small batch, synchronous balanced production management system

Two quick overview (SMED) - what is the smed (SMED)
The case discussion share (never to be)
At present, the die change line change steps and common phenomenon
According to analyze the die change, cause of the slow change line
The basic principle of SMED.
Summary: to establish smed, changing the line to executable target
The three step is to calculate the smed pre preparation time
To identify internal and external preparation for
The external preparation is separated from the production preparation work
To shorten the time of internal and external
The preparatory work of standardization and continuous improvement
Four to accelerate the application of methods and tools for model transformation - proofing method (typical case discussion)
To reduce the decision direction (typical case discussion)
Setting and application of the center line (typical case discussion)
To do a car die change (typical case discussion)
To replace screw tool (typical case discussion)
To establish a benchmark, reduce the adjustment time (typical case discussion)
The eyes do judge - Application of visual management (typical case discussion)
The development of the professional technology - electromagnetic mode (typical case discussion)
Summary: to screen sharing, the classic process of quick die change change
Five how in our factory to implement smed improvement to define improvement team
The master recording and analysis of workflow tools
The analysis of economic production quantity, identify bottlenecks and equilibrium point
The establishment of quick die change to the target
The application of SMED method for continuous improvement
To improve the curing results
The system will improve the application to different production areas
Summary: to share success stories
Six course summary, field solution, case discussion